UKCS Decommissioning Cost Estimate 2022 The total estimated cost of decommissioning UKCS upstream oil and gas infrastructure has fallen by a further £1.5bn to £44.5bn, representing an overall decrease of about £15bn (25%) since the baseline forecast and cost reduction target were introduced in 2017 Download
UKCS Energy Integration Final report August 2020 Energy integration technologies (offshore electrification, CCS, blue and green hydrogen) could contribute around 30% of the UK emissions abatement needed. Download
Annual Report and Accounts 2020-21 Accounts presented to Parliament pursuant to Section 6 of the Government Resources and Accounts Act 2000 (Audit of Non-profit Making Companies) Order 2009 Download
OGA Measurement Guidelines 2020 The purpose of these Guidelines is to set out the Authority’s expectations as to what will generally constitute ‘good oilfield practice’ for the full range of fiscal measurement scenarios that are likely to be encountered in practice Download
UKCS Flaring & Venting Report September 2020 The Authority is fully committed to supporting achievement of the UK’s net zero emissions target and is working with government and industry on the vital role that the oil and gas industry must play in the UK energy transition Download