Filters

Content Type
File Types
News type
Filter by
Documents Image 4
UKCS Decommissioning Cost Estimate 2022

The total estimated cost of decommissioning UKCS upstream oil and gas infrastructure has fallen by a further £1.5bn to £44.5bn, representing an overall decrease of about £15bn (25%) since the baseline forecast and cost reduction target were introduced in 2017

Documents Image 4
UKCS Decommissioning Cost Estimate 2020

The total cost of decommissioning UK offshore oil and gas production, transportation and processing infrastructure has reduced by 19%, on a like-for-like basis, to £48bn compared with the 2017 base-line estimate of £59.7bn