Overview - Decommissioning and Repurposing The North Sea Transition Authority is committed to ensuring the economic recovery of UK oil and gas and to enabling the achievement of the UK Government’s commitment to reach net zero emissions by 2050. View more
UKCS Decommissioning 2018 Cost Estimate Report The cost of oil and gas decommissioning for the UK Continental Shelf (UKCS) has reduced from the 2017 baseline of £59.7bn Download
UKCS Decommissioning 2019 Cost Estimate Report The total cost of decommissioning remaining UK offshore oil and gas production, transportation and processing infrastructure has reduced by 17%, on a like-for-like basis, to £49bn compared with a 2017 base-line estimate of £59.7bn Download
UKCS Decommissioning Cost Estimate 2022 The total estimated cost of decommissioning UKCS upstream oil and gas infrastructure has fallen by a further £1.5bn to £44.5bn, representing an overall decrease of about £15bn (25%) since the baseline forecast and cost reduction target were introduced in 2017 Download
UKCS Decommissioning Benchmarking Report 2020 This report provides comparison data which benchmarks a wide range of UKCS decommissioning activities Download
OGUK Operations : Building Back Better: The Business Case for Multi-Operator Well Campaigns in a Diverse Basin : 10 May 2021 Download